Unit 1: Equipment and Supplies

Error message

  • Notice: Trying to access array offset on value of type bool in hg_reader_node_load() (line 57 of /var/www/vhosts/slider.gatech.edu/httpdocs/sites/all/modules/contrib/hg_reader/inc/hg_reader.node.inc).
  • Notice: Trying to access array offset on value of type bool in hg_reader_node_load() (line 58 of /var/www/vhosts/slider.gatech.edu/httpdocs/sites/all/modules/contrib/hg_reader/inc/hg_reader.node.inc).
  • Notice: Trying to access array offset on value of type bool in hg_reader_node_load() (line 59 of /var/www/vhosts/slider.gatech.edu/httpdocs/sites/all/modules/contrib/hg_reader/inc/hg_reader.node.inc).
  • Notice: Trying to access array offset on value of type bool in hg_reader_node_load() (line 60 of /var/www/vhosts/slider.gatech.edu/httpdocs/sites/all/modules/contrib/hg_reader/inc/hg_reader.node.inc).
  • Notice: Trying to access array offset on value of type bool in hg_reader_node_load() (line 61 of /var/www/vhosts/slider.gatech.edu/httpdocs/sites/all/modules/contrib/hg_reader/inc/hg_reader.node.inc).
  • Notice: Trying to access array offset on value of type bool in hg_reader_node_load() (line 100 of /var/www/vhosts/slider.gatech.edu/httpdocs/sites/all/modules/contrib/hg_reader/inc/hg_reader.node.inc).

All materials listed in Italics are used both is Unit 1 and Unit 2

Unit 1

Equipment and Supplies

Usage

Per Class*

All Classes**

 Curriculum Section(s)

Poster Paper

Group

20 sheets (or paper cut to 16x20)

100-120 sheets

1.1, 1.9

Markers

Group

10 packs

10 packs

1.1, 1.9

Painters Tape/Masking Tape

Group

1 roll

5 rolls

1.4, 1.5, 1.9, 1.10

1 meter measuring tape (paper or cloth)

Group

20 tapes (2 per group)

20 tapes

1.4, 1.5, 1.9

11X17  Corrugated Cardboard Pads

Group

10

30 pads

1.4, 1.5, 1.9, 1.10

Manila folders

Group

10 folders

1 box

1.4, 1.5, 1.9

Flat Washers (1/4 inch thick or less)

Group

300 (30 washers taped together for 10 groups)

360

1.9

*Classes are estimated at 30 students (10 groups)

**It is estimated that teachers will have 5 classes in one day. 

You can adjust your materials needs on these estimations